This project was for a truck depot in Nisku, Alberta.
Griffin Logistics required a cement stabilized-soil pad at their suburban-Edmonton location. The 12,000 m² high-plastic clay yard was stabilized with cement and Altacrete additive.
The pad can now safely accommodate a continuous flow of heavy trucks any time of year.
- job completed in 5 days
- 10 personnel on site
- 5 pieces of our own specialty equipment
- 3 pieces of local sub contractor equipment