Griffin Logistics

This project was for a truck depot in Nisku, Alberta.

Griffin Logistics required a cement stabilized-soil pad at their suburban-Edmonton location. The 12,000 m² high-plastic clay yard was stabilized with cement and Altacrete additive.

The pad can now safely accommodate a continuous flow of heavy trucks any time of year.

  • job completed in 5 days
  • 10 personnel on site
  • 5 pieces of our own specialty equipment
  • 3 pieces of local sub contractor equipment