Portfolio Category: Aprons

Griffin Logistics

This project was for a truck depot in Nisku, Alberta. Griffin Logistics required a cement stabilized-soil pad at their suburban-Edmonton location. The 12,000 m² high-plastic clay yard was stabilized with cement and Altacrete additive. The pad can now safely accommodate a continuous flow of heavy trucks any time of year. job completed in 5 days 10 personnel on…
Read more

Pick-n-Pull

The Calgary Pick-n-Pull yard is in a location with bad soil and a high water table, ideal conditions for mud mayhem. Often customers could not access the yard after rain fall. Bowa Environmental stabilized 25,000 m² of pads and roads in this S.E. industrial area of Calgary, and another yard in Edmonton.
Read more

Pembina Pipelines

This was a 46,000 m² job north of Slave Lake, Alberta in challenging conditions. The original engineering for this project was to use geo-textile and over 1.5 meters of pit run and gravel. Due to the October start date of this project it would have been difficult to finish the project before the winter ground freeze.…
Read more

Edmonton Airport

This project was for creating over 17,000 m² of cement stabilized aprons at the Edmonton International Airport.    
Read more