Projects

  • Cenovus – Foster Creek

    Cenovus – Foster Creek

    This project was for a 20,000 m² SAG-D pad. Cenovous hired Bowa Environmental to apply straight cement to a depth…

    Read more

  • Costa Rica Sarapiqui

    Costa Rica Sarapiqui

    Bowa Environmental is now involved in developing municipal roads in Costa Rica. Costa Rica has challenging road conditions due to…

    Read more

  • Edmonton Airport

    Edmonton Airport

    This project was for creating over 17,000 m² of cement stabilized aprons at the Edmonton International Airport.    

    Read more

  • Griffin Logistics

    Griffin Logistics

    This project was for a truck depot in Nisku, Alberta. Griffin Logistics required a cement stabilized-soil pad at their suburban-Edmonton location. The…

    Read more

  • Kicking Horse Energy

    Kicking Horse Energy

    Previous to Bowa's involvement, Kicking Horse was dealing with crumbling pads in this high-moisture environment. Bowa stabilized a 10,000 m² well pad…

    Read more

  • Pembina Pipelines

    Pembina Pipelines

    This was a 46,000 m² job north of Slave Lake, Alberta in challenging conditions. The original engineering for this project…

    Read more

  • Pick-n-Pull

    Pick-n-Pull

    The Calgary Pick-n-Pull yard is in a location with bad soil and a high water table, ideal conditions for mud…

    Read more

  • Statoil SAGD Pad

    Statoil SAGD Pad

    For this project Bowa created a 32,000 m² SAGD pad by Conklin, Alberta. The soil used to build the pad was glacial…

    Read more