Previous to Bowa's involvement, Kicking Horse was dealing with crumbling pads in this high-moisture environment. Bowa stabilized a 10,000 m² well pad south of Grand Prairie, Alberta on the Husky Road using a combination cement/Altacrete process. Kicking Horse now has a strong, waterproof pad that requires little ongoing maintenance.
Read more
Costa Rica Sarapiqui
Bowa Environmental is now involved in developing municipal roads in Costa Rica. Costa Rica has challenging road conditions due to heavy rains and poor soil quality. In January 2016 Bowa shipped our specialty equipment to work with the Municipality of Sarapiqui to stabilize 3km of road near the town of San Ramone. We worked with local contractors and government…
Read more
Griffin Logistics
This project was for a truck depot in Nisku, Alberta. Griffin Logistics required a cement stabilized-soil pad at their suburban-Edmonton location. The 12,000 m² high-plastic clay yard was stabilized with cement and Altacrete additive. The pad can now safely accommodate a continuous flow of heavy trucks any time of year. job completed in 5 days 10 personnel on…
Read more
Pembina Pipelines
This was a 46,000 m² job north of Slave Lake, Alberta in challenging conditions. The original engineering for this project was to use geo-textile and over 1.5 meters of pit run and gravel. Due to the October start date of this project it would have been difficult to finish the project before the winter ground freeze.…
Read more
- 1
- 2