Portfolio Category: Roads

Kicking Horse Energy

Previous to Bowa's involvement, Kicking Horse was dealing with crumbling pads in this high-moisture environment. Bowa stabilized a 10,000 m² well pad south of Grand Prairie, Alberta on the Husky Road using a combination cement/Altacrete process. Kicking Horse now has a strong, waterproof pad that requires little ongoing maintenance.
Read more

Costa Rica Sarapiqui

Bowa Environmental is now involved in developing municipal roads in Costa Rica. Costa Rica has challenging road conditions due to heavy rains and poor soil quality. In January 2016 Bowa shipped our specialty equipment to work with the Municipality of Sarapiqui to stabilize 3km of road near the town of San Ramone. We worked with local contractors and government…
Read more

Griffin Logistics

This project was for a truck depot in Nisku, Alberta. Griffin Logistics required a cement stabilized-soil pad at their suburban-Edmonton location. The 12,000 m² high-plastic clay yard was stabilized with cement and Altacrete additive. The pad can now safely accommodate a continuous flow of heavy trucks any time of year. job completed in 5 days 10 personnel on…
Read more

Pick-n-Pull

The Calgary Pick-n-Pull yard is in a location with bad soil and a high water table, ideal conditions for mud mayhem. Often customers could not access the yard after rain fall. Bowa Environmental stabilized 25,000 m² of pads and roads in this S.E. industrial area of Calgary, and another yard in Edmonton.
Read more