This project was for a truck depot in Nisku, Alberta. Griffin Logistics required a cement stabilized-soil pad at their suburban-Edmonton location. The 12,000 m² high-plastic clay yard was stabilized with cement and Altacrete additive. The pad can now safely accommodate a continuous flow of heavy trucks any time of year. job completed in 5 days 10 personnel on…
Read more
Pembina Pipelines
This was a 46,000 m² job north of Slave Lake, Alberta in challenging conditions. The original engineering for this project was to use geo-textile and over 1.5 meters of pit run and gravel. Due to the October start date of this project it would have been difficult to finish the project before the winter ground freeze.…
Read more
Statoil SAGD Pad
For this project Bowa created a 32,000 m² SAGD pad by Conklin, Alberta. The soil used to build the pad was glacial till, typical of this region in Northern Alberta. Through lab testing we proved the soil could meet and exceed the load bearing requirements using cement stabilization enhanced with Altactrete, tilled in to a depth of…
Read more
Cenovus – Foster Creek
This project was for a 20,000 m² SAG-D pad. Cenovous hired Bowa Environmental to apply straight cement to a depth of 12 inches. Bowa supplied the specialized heavy equipment and experienced labour personnel.
Read more