Kicking Horse Energy

Previous to Bowa's involvement, Kicking Horse was dealing with crumbling pads in this high-moisture environment. Bowa stabilized a 10,000 m² well pad south of Grand Prairie, Alberta on the Husky Road using a combination cement/Altacrete process. Kicking Horse now has a strong, waterproof pad that requires little ongoing maintenance.
Read more

Costa Rica Sarapiqui

Bowa Environmental is now involved in developing municipal roads in Costa Rica. Costa Rica has challenging road conditions due to heavy rains and poor soil quality. In January 2016 Bowa shipped our specialty equipment to work with the Municipality of Sarapiqui to stabilize 3km of road near the town of San Ramone. We worked with local contractors and government…
Read more

Pembina Pipelines

This was a 46,000 m² job north of Slave Lake, Alberta in challenging conditions. The original engineering for this project was to use geo-textile and over 1.5 meters of pit run and gravel. Due to the October start date of this project it would have been difficult to finish the project before the winter ground freeze.…
Read more

Statoil SAGD Pad

For this project Bowa created a 32,000 m² SAGD pad by Conklin, Alberta. The soil used to build the pad was glacial till, typical of this region in Northern Alberta. Through lab testing we proved the soil could meet and exceed the load bearing requirements using cement stabilization enhanced with Altactrete, tilled in to a depth of…
Read more