Statoil SAGD Pad

For this project Bowa created a 32,000 m² SAGD pad by Conklin, Alberta.

The soil used to build the pad was glacial till, typical of this region in Northern Alberta.

Through lab testing we proved the soil could meet and exceed the load bearing requirements using cement stabilization enhanced with Altactrete, tilled in to a depth of 300mm (12"), adding water, followed by compaction and grading.

This project included a 14 person crew. It was completed 4 days early and on budget.